MIL-D-52923B(ME)
6.2 Ordering data. Procurement documents should specify the following:
a.
Title, number, and date of this specification.
b.
Date of issue of DoDISS applicable and exceptions thereto (see 2.1.1).
c.
When a first article is required (see 3.2).
d.
Time frame required for submission of first article model.
e.
When the Government will conduct any or all of the first article model examinations
and tests. When the Government will conduct some but not all of the first article
examinations and tests, the contracting officer should specify which examinations and
tests will be conducted by the Government and which examinations and tests shall be
conducted by the contractor (see 3.2).
f.
Type and number of technical publications to be furnished (see 3.17).
g.
The repair parts and maintenance tools to be furnished (see 3.18).
h.
When certification is required (see 3.22).
i.
Degree of preservation and packing required (see 5.1).
6.3 First article. When a first article inspection is required, the item should be a
preproduction model. The first article should consist of one or more units. The contracting
officer should include specific instructions in acquisition documents regarding arrangements for
examinations, tests and approval of the first article test results and disposition of the document's
first articles.
6.4 Government-loaned property. The contracting officer should arrange to loan the
property specified in 3.19.
Custodian:
Preparing activity:
Army - ME
Army - ME
Project 3825-A172
24
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business